Concrete footing calculator

Continuous strip footings for a load-bearing wall. We size the width from IRC Table R403.1 by your soil and story count, then give the concrete volume in cubic yards or cubic metres — with the waste factor and the rounding-up step done for you.

A
Detail A — Strip footing
Light-frame, this soil & stories—
Cubic yards—
Cubic feet—
Cubic metres—
— Order — yd³
80 lb bags needed—

01 How the math works

A strip footing is a long rectangular prism of concrete, so its volume is three numbers multiplied together: the length it runs, its width, and its thickness, all in consistent units.

Volume = run length × width × thickness
Run (simple rectangle) = 2 × (length + width)
Width = IRC Table R403.1 [soil bearing × stories]

The width is the part most calculators leave to you. It isn't a number you pick because it looks sturdy — it comes out of IRC Table R403.1, keyed to the soil's bearing value and the number of stories the wall carries. Lighter load or stronger soil, narrower footing; heavier load or weaker soil, wider. For conventional wood-framed walls the floor is 12 in (305 mm) wide and 6 in (152 mm) thick, and nothing in the table goes below that.

The run length is the total length of continuous footing — the building perimeter plus any interior bearing walls. For a plain rectangle with no interior bearing walls, that's just the perimeter, 2 × (length + width).

02 Worked example

Take a 24 ft × 24 ft detached garage (7.32 m × 7.32 m), one story, wood-framed walls on sand that bears 2,000 psf. Table R403.1 puts the footing at its minimum: 12 in (305 mm) wide, poured 6 in (152 mm) thick.

With no interior bearing walls, the footing runs the perimeter: 2 × (24 + 24) = 96 ft (29.26 m). Volume is 96 ft × 1 ft × 0.5 ft = 48 ft³ = 1.78 yd³ (1.36 m³). Add a 10% waste factor and round up to the ready-mix half-yard step: 2.0 yd³ — or 1.5 m³ in metric.

As bagged premix at the standard 0.60 ft³ yield per 80 lb bag, the same footing is 88 bags with the waste included. That's the cue to call the ready-mix supplier, for the reason in the section below.

03 When this calculator is wrong

The width from Table R403.1 is a prescriptive number with assumptions behind it, and those assumptions are where a footing gets under-sized.

04 What to do with the result

A cubic yard of concrete is about 60 bags of 80 lb premix — 4,800 lb to mix and place inside the roughly 90-minute working time before it sets. Above 1 yd³ (0.76 m³), ready-mix is faster, more uniform, and usually cheaper per yard once the $50–150 short-load fee is spread across the pour. The garage above is 2.0 yd³ and 88 bags — well past that line.

The exception is access: if the truck can't reach the forms, bagged or pumped concrete is the call regardless of volume. Either way, order the rounded-up number. A footing poured short leaves a cold joint where the next batch meets it, and that's a weak plane you designed in by running out — order the extra half-yard instead.

05 Common questions

How wide should a concrete footing be?
The IRC minimum is 12 in (305 mm), and that covers a 1-story wood-framed wall on most soils. A 2-story wall on weak clay (1,500 psf) steps up to 15 in, and a 3-story to 23 in. Width tracks the soil's bearing value and the number of stories — that's what Table R403.1 does, and what the calculator above reports.
How thick does a footing have to be?
Minimum 6 in (152 mm) for a plain concrete footing, per IRC R403.1.1. Don't confuse thickness with how deep the footing sits: the bottom has to reach the greater of a 12 in below-grade minimum and the local frost line, which in cold regions runs well past that.
How much concrete do I need for a footing?
Run length × width × thickness, in consistent units, then divide by 27 to read cubic feet as cubic yards. The 96 ft × 12 in × 6 in garage footing above is 48 ft³ = 1.78 yd³. Add waste and round up to the supplier's half-yard step.
Does a footing need rebar?
The IRC allows plain (unreinforced) concrete footings for many one- and two-story cases, but expansive or weak soils, taller walls, and some local amendments require reinforcement — subject to local code. Where rebar is called for, size and space it separately; this calculator sizes concrete only.
What's the difference between a footing and a foundation wall?
The footing is the wide pad at the bottom that spreads the load onto the soil; the foundation (stem) wall sits on top of it and carries the building above. This page sizes the footing. The wall on top is a separate pour with its own volume.